Installation
 
CORE DRILL & GROUT DIRECTLY INTO DECK
SAFTRON ANCH-1 ANCHOR SOCKET (CORE DRILL & GROUT)
SAFTRON SB-3 & SB-F BASE SUPPORTS
SAFTRON EXERCISE / SAFETY GRAB BARS / TOWEL BARS
SAFTRON SSF-48 & SSF-59 SPA RAILS
SAFTRON SUB-48 & SUB-59 Slide-Under SPA RAILS
SAFTRON P-JIG-L & P-JIG-RTD
SAFTRON P-321AG-L4
 
CORE DRILL & GROUT DIRECTLY INTO DECK
  Recommended installation method for:
All in-ground rails, railing and ladders to be installed permanently into a concrete slab.
  • Anchor Sockets(SAFTRON ANCH-1). See instructions below for grouting installation instructions specific to Anchor Sockets.
  •  
      Hints:
  • Core-drilling requires specialized tools.
  • Professional installation is recommended.(Not for the average “do-it-yourselfer”).
  • Rails and ladders will only be as rigid and secure as the supporting foundation. Before installing, make sure the deck is suitable.
  • Avoid scratches. Keep railings in box until ready to install. Don’t place railings on bare ground.
  • Clean spills immediately with wet rag. Don’t allow spilled grout to set on railings or deck.
  •  
      Tools & Materials Required:
  • Core Drill
  • 3” Diameter Core Bit
  • 7-10,000 PSI Non-shrink Hydraulic Grout
  • Mixing Bucket
  • Cold Chisel
  • Hammer
  • Wooden wedges
  • Bubble Level
  • Tape Measure, Markers, String-Line & Adhesive Tape
  • Sponges, Rags, Water, Soft Scrub®
  •  
      Installation Steps:
    1. Measure and mark installation location of railing posts.
    IMPORTANT: WHEN INSTALLING LADDERS, THE HORIZONTAL DISTANCE FROM FACE OF POOL WALL TO MOUNTING POST MUST BE CORRECT TO ENSURE SECURE FIT.REFER TO DIMENSION DRAWINGS FOR YOUR MODEL OF RAIL OR LADDER ON THIS WEB SITE TO DETERMINE REQUIRED DISTANCE.
    2. Drill 3” diameter x 4” deep core in concrete for each post location.
    3. If escutcheons are being installed, slide them onto the posts at this time and secure them with tape away from base.
    4. Fully insert rail or ladder into holes and make sure it is properly aligned and level.
    LADDER BUMPERS MUST REST SQUARELY AGAINST POOL WALL FACE.
    5. Insert small wedges (i.e., wood) around top of opening to secure in place.
    6. Fill hole half way with grout. Re-check for alignment then wait for grout to set.
    7. Once grout has set, remove the wedges and finish filling the hole with grout.
    8. Lower escutcheons to cover grout perimeter.
    DO NOT USE RAIL UNTIL GROUT HAS FULLY CURED.
    9. Rails can be cleaned and polished using a soft rag and household Soft Scrub®.
    DO NOT USE ABRASIVES OR COMMERCIAL SOLVENTS.
     
    SAFTRON ANCH-1 ANCHOR SOCKET (CORE DRILL & GROUT)
      Recommended installation method for:
  • Rails, ladders, safety railings, posts, stanchions, umbrellas, flagpoles, volleyball net posts, etc… that have 1.9” OD mounting posts, and that need to be removable (i.e., for winterizing or storage).
  •  
      Hints:
  • Core-drilling requires specialized tools.
  • Professional installation is recommended.(Not for the average “do-it-yourselfer”).
  • Rails and ladders will only be as rigid and secure as the supporting foundation. Before installing, make sure the deck is suitable.
  • Avoid scratches. Keep railings in box until ready to install. Don’t place railings on bare ground.
  • Clean spills immediately with wet rag. Don’t allow spilled grout to set on railings or deck.
  •  
      Tools & Materials Required:
  • Core Drill
  • 3” Diameter Core Bit
  • 7-10,000 PSI Non-shrink Hydraulic Grout
  • Mixing Bucket
  • Cold Chisel
  • Hammer
  • Wooden wedges
  • Bubble Level
  • Tape Measure, Markers, String-Line & Adhesive Tape
  • Sponges, Rags, Water, Soft Scrub®
  • Saftron P-JIG-L or P-JIG-RTD (Optional)
  • ½ “ Wrench or Socket
  •  
      Installation Steps:
    1. Measure and mark desired location of rail or ladder posts.
    2. Determine required location of Anchor Socket to achieve post location.
    NOTE: CENTER OF ANCHOR SOCKET IS NOT CENTER OF POST. DRAWING BELOW SHOWS DIMENSIONS. PDF FILE DRAWING PRINTED ON 8” X 11” PAPER CAN BE PRINTED AND USED AS TEMPLATE.

    CLICK HERE TO DOWNLOAD SCALE DRAWING IN PDF FILE FORMAT

    IMPORTANT:WHEN INSTALLING LADDERS, THE HORIZONTAL DISTANCE FROM FACE OF POOL WALL TO MOUNTING POST MUST BE CORRECT TO ENSURE SECURE FIT. REFER TO DIMENSION DRAWINGS FOR YOUR MODEL OF RAIL OR LADDER ON THIS WEB SITE TO DETERMINE REQUIRED DISTANCE.
    3. Drill TWO overlapping 3” diameter cores in concrete to a depth of 4-1/4” – 4-1/2” for each anchor socket location as shown on above template and as illustrated below.
    DO NOT MAKE HOLES LARGER THAN NECESSARY OR ESCUTCHEONS MAY NOT COVER ENTIRE GROUTED AREA.
    4. Tape over hole in base cover of anchor socket.
    5. Attach and firmly seat anchor socket(s) to Saftron P-JIG-L or P-JIG-RTD Jig, and tighten bolt (or use any other method to ensure proper alignment).
    6. OPTIONAL:IF INSTALLING STEEL RAILS THAT REQUIRE GROUNDING (Saftron Rails are non-conductive and do not require Grounding/Bonding):
    a. Attach grounding/bonding wire to connection terminal on side of anchor socket between washers, then tighten bolt.
    7. Place Anchor Socket(s) in grout holes. Re-check position and alignment. Secure in place with wood wedges.
    8. Fill void around anchor socket(s) with grout.
    9. Once grout has fully cured, remove jig, insert rail or ladder, and securely tighten fastening bolt.
    DO NOT OVER-TIGHTEN.
    DO NOT USE RAIL UNTIL GROUT HAS FULLY CURED.
    10. Rails can be cleaned and polished using a soft rag and household Soft Scrub®.
    DO NOT USE ABRASIVES OR COMMERCIAL SOLVENTS.
     
      ANCH-1 ANCHOR SOCKET USE:
      TO INSTALL RAILS:
    1. Use ½” wrench or socket to lower wedge about ½” inside socket by turning bolt counterclockwise.
    WARNING: TOO MANY TURNS WILL DISENGAGE WEDGE FROM BOLT.
    2. Insert rail or ladder post into Anchor socket.
    3. Tighten by turning bolt clockwise until secure.
    DO NOT OVER-TIGHTEN.
     
     
      TO REMOVE RAILS:
    1. Use ½” Wrench or Socket. Turn Counterclockwise a few turns.
    NOTE: TOO MANY TURNS WILL DISENGAGE WEDGE FROM BOLT.
    2. If bolt head rises after a few turns, tap bolt head down.
    3. Remove rail.
     
     
    SAFTRON SB-3 & SB-F BASE SUPPORTS
      Recommended installation method for:
  • To install Rails, Ladders, Safety Railing, Slides, Posts, Stanchions, Volleyball Nets, Shade Structures, Umbrellas, Flagpoles and other items that have 1.9” OD mounting posts. Mount to concrete or wood deck surfaces or to (sturdy) steps leading up to above-ground spas.

    Refer to compatibility chart to determine appropriate model for use with specific SAFTRON Rails.
  •  
      Hints:
  • Install quickly with common household tools.
  • Leave minimal damage when removed.
  • Suitable for wood or concrete decks.
  • Rails and ladders will only be as rigid and secure as the supporting foundation. Before installing, make sure the deck is suitable.
  • Avoid scratches. Keep railings in box until ready to install. Don’t place railings on bare ground.
  •  
      Tools & Materials Required:
  • Tape Measure & Markers
  • ½” Socket or Wrench
  • Battery Powered drill

    (WARNING:DO NOT USE MAINS-POWERED TOOLS NEAR WATER)

  • 5/16” Masonry bit (for concrete decks)
  • 3/16” Pilot Hole Bit (for wood decks)
  • Alligator® Anchors (Included)
  • 316” Grade Marine Stainless Steel 5/16” Lag Bolts & Washers (included)
  • Soft Scrub®
  •  
      Installation Steps:
     
      CONCRETE DECKS:
    1. Place rail or ladder in base and select desired location.
    IMPORTANT: If base will be used with a “lift and turn” SAFTRON Spa rail, slide rectangular insert in slot in underside of SB-6 Base. Position so insert is parallel to side of Spa. THIS ENSURES THAT RAIL POSITIONS WILL BE PERPENDICULAR TO SPA. IF IN DOUBT, TEST BEFORE DRILLING.
    2. Mark hole locations (3 holes for SB-6, 4 holes for SB-3).
    3. Drill marked hole locations using 5/16” masonry bit to depth of 2”.
    DO NOT OVER-SIZE THE HOLE!
    4. Insert Alligator® Anchors into holes until flush with surface.
    5. Attach base using included lag bolts and washers
    6. Rails can be cleaned and polished using a soft rag and household Soft Scrub®.
    DO NOT USE ABRASIVES OR COMMERCIAL SOLVENTS.
    IMPORTANT: WHEN INSTALLING LADDERS, THE HORIZONTAL DISTANCE FROM FACE OF POOL WALL TO MOUNTING POST MUST BE CORRECT TO ENSURE SECURE FIT.REFER TO DIMENSION DRAWINGS FOR YOUR MODEL OF RAIL OR LADDER ON THIS WEB SITE TO DETERMINE REQUIRED DISTANCE.
     
      WOOD DECKS:
    1. Place rail or ladder in base and place in desired location.
    2. Mark hole locations (3 holes for SB-6, 4 holes for SB-3).
    3. Drill marked hole locations using 3/16” pilot hole bit to depth of 2”.
    4. If base will be used with a “lift and turn” SAFTRON Spa rail, slide rectangular insert into slot in underside of SB-6 Base.
    5. Attach base using provided lag bolts and washers
    6. Rails can be cleaned and polished using a soft rag and household Soft Scrub®.
    DO NOT USE ABRASIVES OR COMMERCIAL SOLVENTS.
    IMPORTANT: WHEN INSTALLING LADDERS, THE HORIZONTAL DISTANCE FROM FACE OF POOL WALL TO MOUNTING POST MUST BE CORRECT TO ENSURE SECURE FIT.REFER TO DIMENSION DRAWINGS FOR YOUR MODEL OF RAIL OR LADDER ON THIS WEB SITE TO DETERMINE REQUIRED DISTANCE.
     
    SAFTRON EXERCISE / SAFETY GRAB BARS / TOWEL BARS
      Installation instructions:
  • Can attach to Concrete / Marcite Pool walls or installed outside pools to any suitable surface and used as grab bars, door handles or towel bars…
  • Non-conductive material does not require grounding.
  • Kits include all necessary hardware for 15 minute installation.
  • Grab Bars will only be as rigid and secure as the supporting foundation. Before installing make sure surface is suitable.
  • Avoid scratches. Keep Ex-Bars in box until ready to install. Don’t place Ex-Bars on bare ground.
  •  
      Tools & Materials Required:
  • Tape Measure & Markers.
  • ½” Socket or Wrench
  • Battery Powered drill

    (WARNING:DO NOT USE MAINS-POWERED TOOLS NEAR WATER)

  • Alligator® Anchors (Included)
  • 5/16” Masonry bit (for concrete decks)
  • Soft Scrub®
  •  
    Installation Instructions
    1. Mark post locations. 2. Use mounting to caps to mark centers. 3. Drill hole in masonry with provideed bit to depth of 2, 1/2" 4. Clean hole and insert anchors.

    [VIDEO]

    5. Firmly attach Mounting   Caps with provided lag bolts   and washes. 6. Apply adhesive to inside surface of Saftey/Exersice Bar. 7. Tap Safety/ Exersice Bar onto mounting caps. 8.Wait 30 minutes then ..............
    ENJOY!

    CAUTION: Safety rails should be installed by licensed contractor. If self-installing, make sure pool is empty or use a battery operated drill. Never use A/C powered tools near water.
    SAFTRON SSF-48 & SSF-59 SPA RAILS
      Instructions to install SSF series of Spa Rails to above-ground SPAS:
      Notes:
  • SSF Series Spa Rails attach to ground and to side of SPA
  • Install with common household tools.
  • Suitable for most above-ground SPAS.
  • CAUTION:VERIFY WITH SPA MANUFACTURER THAT SPACE BEHIND SELECTED MOUNTING LOCATION IS CLEAR OF INTERNAL COMPONENTS AND WIRING.
     
      TOOLS REQUIRED:
      INCLUDED ITEMS:
  • ONE SSF-48 or SSF-59 Spa Rail
  • ONE Slip-T Fitting Assembly
  • ONE “End-cap” socket
  • ONE 2” x ¼” Bolt
  • ONE ¼” Fender Washer
  • ONE Staptoggle® ¼”-20 Hollow Wall Anchor
  • ONE Single-Use tube of Adhesive
  • ONE SB-6 6” Floor Base without set-screws
  • ONE Floor Base Rectangular Insert
  • THREE 5/16” x 2” Lag Bolts
  • THREE 5/16” Washers
  • THREE 5/16” Alligator® Anchors
  •   TOOLS REQUIRED:
  • Tape Measure & Markers.
  • 1/2” & 7/16” Socket Wrench
  • Rubber Mallet
  • Battery Powered drill

    (WARNING:DO NOT USE MAINS-POWERED TOOLS NEAR WATER)

  • ½” Drill Bit
  • Soft Scrub®
  •  
      Installation Steps:
    WARNING: Before installing, verify with Spa Manufacturer that space behind selected mounting location for Slip-T Fitting is clear of internal components or wiring, and that Spa wall is strong enough to support spa rail!
    CAUTION: Never use electric drills in or around water!
    1. Slide Slip-T support fitting onto rail and place rail in SB-6 Base.
    2. Hold rail assembly in desired location and mark hole locations for base and for Slip-T Support.
    3. Attach SB-6 base to floor as per SB-6 Mounting Instructions
    4. Use ½” bit to drill hole at location on spa marked for Slip-T.
    5. Insert Snaptoggle® Wall Anchor by holding metal channel flat alongside plastic straps and sliding through ½” hole.
    6. Pull ends of Snaptoggle® Wall Anchor straps toward you until channel rests against Spa wall.
    7. Slide plastic cap along straps until flange of cap rests against wall.
    8. Snap off straps.
    Note: Click here for graphic illustration on installation of Snaptoggle® Anchors.
    9. Place end cap socket over flange, and secure using fender washer and ¼” bolt with 7/16” socket wrench.
    10. Make sure End-Cap Socket and Slip-T Assembly are properly aligned, and both surfaces are clean and dry.
    11. Apply adhesive to inside wall of end cap only.
    12. Tap Slip-T assembly into End-Cap Socket with rubber mallet.
    13. Rails can be cleaned and polished using a soft rag and household Soft Scrub®.
    DO NOT USE ABRASIVES OR COMMERCIAL SOLVENTS.
    Work quickly! ADHESIVE starts to set in 20 seconds.Do not spill ADHESIVE on railing surfaces. Avoid contact with skin.
    Wait AT LEAST 30 minutes before using.
    NOTE: The Slip-T Assembly is designed to provide horizontal support to Spa Rail when inserted into SB-F 6” base ONLY. Pulling on rail if not fully inserted may cause damage TO the Slip-T, or to the side of the spa.
     

    SAFTRON SUB-48 & SUB-59 Slide-Under SPA RAILS
      Instructions to install SSF series of Spa Rails to above-ground SPAS:
      Note:
  • Ready to use.
  • Install with common household tools.
  • Suitable for most above-ground SPAS.
  •  
      Tools & Materials Required:
      INCLUDED ITEMS:
  • ONE SUB-48 or SUB-59 Spa Rail (included)
  • ONE Powder-coated aluminum Slide-Under Spa support & SB-6 base assembly.
  • EIGHT Stainless Steel Pan-Head Wood Screws
  •   TOOLS REQUIRED:
  • Screwdriver
  • Soft Scrub®
  •  
      Installation Steps:
    1. Determine location of Spa Rail
    2. Lift side of (empty) spa.
    3. Slide flat aluminum base under spa until back of support is flush with wall.
    4. Lower spa onto support.
    5. OPTIONAL: If additional support is desired, attach 8 included wood screws to side of spa.
    6. Rails can be cleaned and polished using a soft rag and household Soft Scrub®.
    DO NOT USE ABRASIVES OR COMMERCIAL SOLVENTS.
     
    SAFTRON P-JIG-L & P-JIG-RTD
      Instructions for use of SAFTRON Reusable Installation Jigs to align Anchor Sockets during   installation.
      Notes:
  • Saftron Jigs are multiple-use installation alignment tools.
  • Ready to use.
  • P-JIG-L Jig aligns Anchor Sockets for use with standard 20” on center Ladders.
  • P-JIG-RTD aligns Anchor Sockets for use with standard 8” on center Return-to-Deck rails.
  •  
      Instructions:
    1. Insert each post of JIG all the way into an anchor socket.
    2. Rotate Anchor Sockets to desired position and tighten bolt.
    3. Place Jig / Anchor Socket assembly in grout holes.
    4. Re-check position, alignment and depth of Anchor Sockets. Bubble level(s) should be centered. If necessary, use wooden wedges to hold in place.
    5. Fill void around anchor socket(s) with grout.
    6. Once grout has fully cured, loosen Anchor Socket bolt, remove jig and replace with ladder or rail.
     
    SAFTRON P-321AG-L4
      Instructions to install SAFTRON Above Ground Pool Ladders:
      Notes:
  • Install with common household tools.
  • Suitable for above-ground Pools up to 60” deep.
  •  
      TOOLS REQUIRED:
  • Screwdriver
  • Pencil,
  • ½” Wrench or Socket,
  • Hacksaw,
  • Allen Keys,
  • Cordless drill* & pilot drill bit.
  • Soft Scrub®
  •  
      Installation Steps:
    1. Temporarily attach one side of upper ladder rail to lower post with included ladder bolts (do not attach steps or tighten nuts).
    2. Attach SB-3 base to upper section.
    3. Attach floor panel to lower section.
    4. Insert assembly in pool in desired location and measure distance between deck and SB-3 base. (Make sure rail is straight).
    5. Use pencil to mark excessive length on both lower ladder posts (make sure to mark on the end opposite the bolt holes).
    6. Cut off excess with hacksaw.
    7. Assemble both upper rails to lower posts and attach steps using included ladder bolts, washers and nuts.
    8. Attach floor panel and SB-3 bases with Allen key, and place in pool.
    9. Attach SB-3 bases to deck surface in desired location using included lag-bolts and washers. (A pilot hole may be required for some ecks).
    10. Rails can be cleaned and polished using a soft rag and household Soft Scrub®.
    DO NOT USE ABRASIVES OR COMMERCIAL SOLVENTS.
     
     